Monday, December 2, 2019

Construction Update:


With the cold weather moving in, construction at Central Middle School is moving indoors.
Drywall and interior work is happening in a temporarily heated space, while exterior
panels are being installed as the weather allows. 


Underground work is being completed at Northern’s natatorium. The foundation is set and
walls are going up. 


At West Middle School traffic is flowing normal at the bus loop, as the work that was impacting that area has been completed. The new gym is being painted and tile work is being completed. The STEAM area is being painted and polished concrete is being completed. 

Punch list items will continue to be worked on at other locations. Grading work still needs to be finished at the Northern Athletic Event Facilities (AEF) throws area, the Central AEF has a number of punch list items remaining . It is expected that the remaining punch list items at North Middle School will be completed over the holiday break. 

Wednesday, August 21, 2019

Ready to Start the Year with New Facilities

There has been alot of activity on PPS construction projects, especially as we get ready to start the 2019-2020 school year.  The first football game with be played in the new McCamley Stadium on Thursday August 29 with the kick-off event, First Night Under the Lights. Tickets are on sale at the Central High School Athletic Office.


Here are some of the things happening to prepare for the big night!

  • Turf work for soccer and football completed
  • Track surface completed and lines painted
  • Team building exterior completed next week
  • Concession buildings competed and inspected
  • Northeast parking base coat completed
  • Ticket booths competed
  • South-end practice field regraded and irrigation installed
Across town the final work is underway to prepare the new North Middle School for students on September 3.

  • Interior
    • Schedule furniture installation will be complete
    • Classroom punch list started along with final cleaning of all floors
    • Vendor exciting site in process
    • Final inspections completed
  • Exterior
    • Old North Middle school demolition completed
    • Storm sewer work and parking structure under way
    • Sidewalks completed


Crews are wrapping up summer work at West Middle School, ready to switch gears to projects that can be done while students are in class. Here is w hat was competed over the summer.

  • Northweat waterline completed
  • Interior walls and door frame painting completed
  • New fire systems completed
  • Scheduled electrical grids and HVAC completed
  • Scheduled ceiling grids and lighting installed
  • Reinstalling classroom technology
  • Bathroom renovations in progress
  • Re-entry move begins this week. 





 

Thursday, July 25, 2019

Summer Construction Update

Summer construction is moving along quickly as the push is on to be ready for the beginning of the 2019-20 school year.

North Middle School

At North Middle School, the furniture is arriving and is being installed on the third floor. Meanwhile crews working their way down to the lower levels to finish ceiling tiles and flooring.

  Classroom Furniture

Science Lab Tables

Outside, the old North Middle demolition continues. The ground work is being completed and the first layer of asphalt for the parking lot will be down soon. Sidewalks are scheduled in a couple of weeks.


 Old North Middle School Demolition
West Middle School

With the exception of the construction signs and some fencing, things look pretty normal on the outside at West Middle School.  Inside, the first phase of interior renovations are underway.  The pool and bleachers have been demolished.  Plumbing and bathroom upgrades are being worked on, and a new fire system is being installed in addition to HVAC and electrical work.


Central Athletic Event Facility

The new turf is completed and the track surface is down. Lines will be painted next. The entrance gate and ticket booths area coming together. The exteriors of the team building and concession stand are being completed while the final touches are being added inside to be ready for inspection in three weeks.  You will soon notice the site beginning to be cleared for parking lot work.  You will be able to see it all at the First Night Under the Lights Celebration on August 29th.






Tuesday, April 23, 2019

Progress at Central Middle School And Athletic Events Facilities

Spring has sprung and so have the facilities on the Portage Central campus!  Here is the latest flyover video of the construction projects.



Tuesday, March 5, 2019

West Middle School Renovation Plans

Remodeling will begin this summer at Portage West Middle School. The project will be completed in six phases between April 2019 to August 2020. Each stage has been carefully planned to maximize how much work can happen in the summer, and minimizing how much disruption is caused by construction when classes are in session. Click on the image below to see the entire plan and timeline developed by the architecture and engineering firm c2ae.